Ground Mounted Solar Structures: Design for India's Mega Projects
Date: 05-02-2026 | Author: Sugatu
Ground-mounted structures power 70% of India's 103GW solar capacity, ideal for Rajasthan deserts and wasteland. Sugatu's 15x2 table designs for thin-film modules minimize foundations via optimized row spacing, cutting BOS by 15%. Fixed-tilt angles (10-20°) match latitude for max yield, with 1.8m ground clearance for cleaning bots.
Galvanized steel or aluminum withstands 160km/hr winds, using pile-driven or grouted bases per IS 875. February trends highlight trackers vs. fixed mounts—Sugatu offers both for 200GW targets. Integrate with Sugatu's Cahors connectors for string efficiency.
Benefits include scalability for 50MW+ parks and shading minimization via heliostat modeling. Sugatu handles engineering, procurement, and wind tunnel validation. Amid open-access solar surges in Gujarat and Karnataka, secure your site now.